Massachusetts municipalities enforce one of three energy codes, and the requirements change again by project type and permit date. Two neighboring towns can hold the same house to different standards.

Base Energy Code

The statewide minimum. A shrinking number of municipalities still sit here, and the requirements are the least demanding of the three.

Stretch Energy Code

Adopted by the large majority of Massachusetts municipalities. Compliance normally runs through a HERS rating with a target that depends on fuel type and project type.

Specialized Energy Code

The Stretch Code plus net-zero-ready requirements — wiring for future full electrification, and on-site solar on many mixed-fuel pathways. The hardest of the three to hit late.

Not sure which one your town adopted? Massachusetts publishes the current adoption list by municipality.

Check your municipality

Stretch Code HERS targets

These are the targets on the Stretch Code HERS pathway. They are a starting point, not a verdict — your permit date, municipality and project type decide which row actually governs your build.

Stretch Code HERS index targets by project type and fuel source
Project All-electric Mixed-fuel
Residential new construction HERS 45 HERS 42
With R406.5.2 embodied carbon credit HERS 48 HERS 45
Accessory dwelling units (ADU) HERS 55 HERS 52
Renovations and additions HERS 70 HERS 65

On renovations and additions, on-site solar generation raises the allowed target by five points (HERS 75 all-electric, HERS 70 mixed-fuel). Reviewed August 2026 against the Massachusetts Stretch and Specialized Code. Codes, municipal adoptions and thresholds change. Confirm the requirement for your specific project before ordering materials or equipment.

It is not only the HERS number that changed

  • One EV-ready space with wiring is required per house. Multi-family projects also require EV-ready provision, but the count varies.
  • ERV or HRV is now required. Bath fans no longer satisfy whole-house mechanical ventilation on their own.
  • HVAC duct leakage testing applies to all systems — including ducts that sit entirely within the conditioned envelope.
  • A HERS rating is required for additions over 1,000 sq ft, or over 50% of the original structure (Level 3 Alteration per IEBC).

What compliance support includes

We review your project location, permit timing, plans and proposed equipment to identify the applicable compliance path, then prepare the energy model, testing and documentation the project needs.

  • Review of the energy code your municipality has actually adopted
  • Preliminary HERS or energy-compliance documentation for the permit set
  • A concise list of missing information or recommended changes
  • Coordination during construction and technical support for the trades
  • Required field inspections and performance testing
  • Final compliance documentation for the Certificate of Occupancy